Case Study
Cabin Masking Cleanroom – Kenworth
Overview
Design and construction of a cleanroom enclosure to eliminate contamination during cabin masking, improving paint quality and reducing rework.
Scope of Work
Insulated panel cleanroom enclosure
Temperature and humidity controlled HVAC system
High-efficiency filtration system
PLC control system integrated with SCADA
Electrical and services integration
Key Challenges
Restricted working area within operational plant
Short installation timeframe
Multi-disciplinary coordination
Zero production downtime
Solution
A fully enclosed cleanroom was installed at the spray booth entry, incorporating controlled airflow, filtration, and environmental conditioning to eliminate airborne contamination.
Outcome
Near elimination of paint rework
Improved finish quality
Increased production capacity
Delivered on schedule and within budget